Cardiff Bus Interchange Terminal
Project: Cardiff Bus Interchange Terminal
Segment: Additional areas, Terminals
Country/city: United Kingdom, Cardiff
Main contractor: ISG
Sub-contractor: SAM Drylining
Architect: BDP (Building Design Partnership)
Installer: SAM Drylining
Photographer: Phil Boorman
Project size: 500m2
Designed by Gemma Jones at BDP (Building Design Partnership) the new Cardiff Interchange Terminal, for the Transport for Wales features a large number of Ecophon Solo™ Rectangle rafts in the main concourse. The project is an example of how great teamwork can give impressive results.
With safety concerns and environmental factors, such as wind loading, additional fixing solutions were implemented to the Solo Rectangle rafts. To prevent wind to dislodge the rafts when the front sliding doors were open, two installation methods were used. In addition to the standard Connect Adjustable wire hanger and Connect Absorber anchor installation, a secondary method consisting of Main Runners with rigid angle hangers screwed to the sides of the Main runners was also used. The solution complies with the important safety measures needed for a public space.
Due to the large scale of this project, Ecophon laser projection service was used to complete the setting out process. Our technical team worked alongside the contractor, ISG & SAM Drylining, to prepare the plans for the panel layout. This involved placing the location of the fixing points directly into the initial design drawings, the drawings were then uploaded into the projection unit, ready for projection.
For a process that would normally involve fixing points being hand marked on the ceiling, the Ecophon laser projection service makes this job five times faster than the traditional method, as well as ensuring accuracy.
“Ecophon providing a setting out service with their new laser equipment made the coordination with our Mechanical and electrical services much easier, taking only days to set out the hangers instead of weeks.” Ian Lewis, Project Manager, ISG.